Client: Data-center-delta
Place of construction – Vladimir. The work starts in October 2022.
Works performed:
- Clearing the land
- Preparation of the site for construction
- Summing up of main engineering communications
- Construction of temporary roads
- Earthworks
- Arrangement of the pile field
- Construction of foundations
- Overlap device
- Installation of rough floors
- Installation of columns
- Installation of metal structures (trusses, beams, half-timbered frames, etc.)
- Staircases and marches
- Installation of the railway plinth
- Installation of facade sandwich panels
- Installation of the roof Installation of stained glass windows, doors, windows
- Installation of gates, bridges, curtains, hermetization
- The device of reinforced floors with preparation
- Finishing works
- Internal engineering
- Installation of equipment
- Kit VK, OViK, AUPT, APS, SOWE, EO, EM, ES